The customer was at the early stage of planning works for a loft conversion. The Boiler Hub were able to help Mr Jobson upgrade his boiler and hot water system.
With room at a premium, Charlie The Boiler Hub’s engineer built a timber wall to support the controls, pumps and valves.
A new 22mm water main to supply the unvented was upgraded from the kitchen, through existing boxing in.